Biomass Gasification Layout
Biomass Plant Components
Each biomass gasification system can be scaled to meet the waste disposal and energy needs of the local communities. The plant will take in approximately 20,000 tons of biomass solid waste annually for every megawatt of hourly power produced. The plant can be located and constructed anywhere that could supply the necessary tonnage of solid biomass waste materials. The plant size and design will be determined by the availability of the solid green waste and the analysis of the heat value or BTU content of the waste materials.